Additional questions to prepare for the MN contractors exam
1 / 155
1. Fire-retardant-treated wood, when used in roof construction, shall have a maximumlisted flame spread index of _______________.
Page 427
R802.1.5
2 / 155
2. End-jointed lumber used in an assembly required by the IRC to have a fire resistancerating must have the designation _______________ included in its grade mark.
Page 215
R602.1.2
3 / 155
3. Where a permanent wood foundation basement wall system is used, the wall shall besupported by a minimum _______________ footing plate resting on gravel orcrushed stone fill a minimum of _______________ in width.
Page
Figure R403.1(2)
4 / 155
4. What is the minimum total net free ventilating area required for a 1,500-square-footattic space where 75 percent of the required ventilation area is provided by ventilatorslocated in the upper portion of the attic space?
Page472
R806.2
5 / 155
5. Smoothing to fill in the hollows and compact concrete is defined as.
Floating is defined as smoothing with a bull float to fill in the hollows and compact the concrete after screeding.
6 / 155
6. In an asphalt shingle roof application, step flashing on a sidewall shall be a minimumof _______________ inches high and _______________ inches wide.
Page 481
R905.2.8.3
7 / 155
7. On a masonry chimney what is the minimum thickness for a hearth extension?
8 / 155
8. According to ASTM E 283-E what is the maximum allowed air leakage rate for recessed lights?
Page 59 then page 48
R402.4.4
9 / 155
9. Where floor joists frame from opposite sides across the top of a wood girder and arelapped, the minimum lap shall be _______________.
Page 183
R502.6.1
10 / 155
10. For a remodeling project what is the minimum warranty requirement for the mechanical system?
MN Statute 327A.02 Subd 3 (2b)
11 / 155
11. Where unfaced fiberglass batt insulation is used as a fireblocking material in thewall cavity of a wood stud wall system, the insulation shall be installed with a minimumvertical height of _______________ .
Page 234 and 104
R602.8 and R302.11.1.2
12 / 155
12. The commissioner may issue a penalty of up to ___________for each violation of applicable laws
MN Statute 326B.082 Subd 7
13 / 155
13. A contractor must warranty their work for the required time unless...
MN Statute 327A.02
14 / 155
14. The minimum window SHGC for climate zone 6 is...
Page 43
Table R402.1.1
15 / 155
15. What is the maximum center-to-center stud spacing permitted for a 2-inch by6-inch, 8-foot-high wood stud bearing wall supporting two floors, roof and ceiling?
Page 225
Table R602.3(5)
16 / 155
16. In wood wall framing where top and bottom plates are attached to the studs, whichof the following fastening methods is acceptable?
Page 217
Table R602.3(1), #16
17 / 155
17. In order to use the prescriptive method for simplified wind loads of the 2020 MN Residential Code the building must meet the following requirements except.
Page 19
1303.2200 Subp 1
18 / 155
18. If there is a conflict in the code between a general requirement and a specific requirement, the _______________ requirement shall apply.
Page 3 1300.0040 Subp2
19 / 155
19. A sketch is defined as...
A sketch is defined as a rough hand drawing that shows ideas.
20 / 155
20. When natural ventilation is used to satisfy the minimum ventilation requirements forhabitable rooms, the aggregate open area to the outdoors shall be a minimum of_______________ of the floor area.
Page 105
R303.1
21 / 155
21. Deck joists for wood-framed exterior decks are permitted to cantilever a maximum of__________ of the joist span.
Page 207
R507.6
22 / 155
22. An Exterior Insulation Finish System (EIFS) shall terminate a minimum of_______________ above the finished ground level.
Page 422
R703.9.1 #5
23 / 155
23. For homes that are 400 sq feet or less What is the maximum distance between the loft and an egress window?
Page 568 AQ105.1
24 / 155
24. Setting goals, analyzing results and controling costs are part of...
Page 17 of the workbook
25 / 155
25. Unless grading is prohibited by physical barriers, lots shall be graded away from thefoundation with a minimum fall of _______________ within the first
Page 127
R401.3
26 / 155
26. The minimum offset for end joints in a double top plate shall be _______________.
Page 219
R602.3.2
27 / 155
27. Where waterproofing of a masonry foundation wall is necessary due to the presenceof a high water table, a minimum membrane thickness of _______________ isrequired if the waterproofing material is polymer-modified asphalt.
Page 174
R406.2 #5
28 / 155
28. In order to better market your construction company you change the business name. How many days do you have to inform the commissioner?
MN Statute 326B.805 Subd 5
29 / 155
29. If an individual or business submits an invoice with materials and time itemized on the bill the entity is considered a
MN Statute 181.723 Subd 4
30 / 155
30. Timely renewal of a contractors license is when applications are received by_____ every other year
MN Statute 326B.885
31 / 155
31. A 15-inch-deep box header in an exterior wall is constructed with wood structuralpanels on both sides. What is the maximum allowable header span for a conditionwhere the header supports a clear-span roof truss with a span of 26 feet?
Page 235
Table R602.7.3
32 / 155
32. All contractors in Minnesota must register with the Department of Labor except...
MN Statute 326B.701
33 / 155
33. A weep screed installed on exterior stud walls in an exterior plaster applicationmust be placed a minimum of _______________ inch(es) above paved areas.
Page 414
R703.7.2.1
34 / 155
34. The water-resistive vapor permeable barrier required to be applied over wood-basedwall sheathing shall have a performance level equivalent to that of _______________layer(s) of Grade _______________ paper.
R703.7.3
35 / 155
35. Where ledgers are used at the connection between a masonry wall and a wood floorsystem having floor joists spanning 16 feet, 1/2-inch ledger bolts shall be located at amaximum of _______________ on center, provided the building is in SeismicDesign Category A, B or C and the wind loads are less than 30 psf.
Page 313
Figure R606.11(1)
36 / 155
36. Where a masonry chimney is constructed totally outside the exterior walls of a dwelling,a minimum air space clearance to combustibles of _______________ is required.
Page 499 R1003.18
37 / 155
37. The minimum distance from a window for a radon vent pipe is...
Page 21
1303.2402 Subp 5
38 / 155
38. Holes bored into solid lumber joists, rafter and beams shall be located a minimum of_______________ from the top or bottom of the member.
R502.8.1
39 / 155
39. A permit for a temporary structure is limited as to time of service, but shall not be allowed for more than _______________ days.
Page 8
1300.0120 Subp 11
40 / 155
40. The minimum insurance requirements for property damage is
MN Statute 326B.86 Subd 2
41 / 155
41. A contractor has a contract to remodel their clients bathroom. In order for a contractor to have lein rights. The contractor must...
MN Statute 514.011 Subd 1
42 / 155
42. Construction documents are required to have all of the following information except.
Page 9
1300.0130 Subp.2
43 / 155
43. What is the minimum required width and thickness for concrete footings supportinglight-frame construction for a two-story 32-foot-wide house with a crawl space, in alocale with a 30 psf snow load and soil with a load-bearing value of 2000?
Page 130
Table R403.1(1)
44 / 155
44. What is the minimum STC rating for walls and ceilings between dwelling units?
Page 563 AK102.1
45 / 155
45. Where the ground snow load is 30 psf, what is the maximum allowable span of abuilt-up spruce-pine-fir girder consisting of three 2 by 12s when it is located at anexterior bearing wall and supports a roof, a ceiling and one center-bearing floor in abuilding having a width of 24 feet?
Page 183 then 230
R502.5 then Table R602.7(1)
46 / 155
46. The ultimate design wind speed to be used for a majority of the United States is_______________.
Page 76 Table 301.2(1)
47 / 155
47. The net free area of a spark arrester for a masonry chimney shall be a minimum of_______________ time(s) the net free area of the outlet of the chimney flue it serves.
Page 496
R1003.9.2 #1
48 / 155
48. In general, the minimum required ceiling height of all habitable rooms is_______________.
Page 107
R305.1
49 / 155
49. Where an unvented conditioned attic assembly is utilized for a residence, the use ofwood shakes on the roof would require a minimum continuous _______________ -inch vented air space between the shakes and the roofing felt.
Page 472
R806.5 #3
50 / 155
50. In order to create an educated and unbiased resolution board. The membership of the board of appeals _______________.
Page 15
1300.0230 Subp 2
51 / 155
51. Utility grade studs, where used in loadbearing walls supporting only a roof and aceiling, shall have a maximum height of _______________ feet.
R602.3.1 Exception 1
52 / 155
52. For tapersawn shakes installed on a roof, the spacing between wood shakes shall be aminimum of _______________ and a maximum of _______________.
Page 484
R905.8.6
53 / 155
53. To be an independent contractor in Minnesota and not an employee you must abide by the following except.
54 / 155
54. When installing an ERV in a new house the HVAC contractor must balance the intake within ____ of the exhaust
Page 51
R403.5.5
55 / 155
55. A warranty on a remodeling project starts when...
56 / 155
56. In Minnesota's climate what is the maximum number of air changes per hour allowed?
Page 48
R402.4.1.2
57 / 155
57. Which of the following standards is applicable for factory-built fireplaces?
Page 668 UL 127—2011: Factory-built Fireplaces—with revisions through May 2015R1001.11, R1004.1, R1004.4, R1004.5, R1005.4
58 / 155
58. Where an exterior wall top plate is notched to the extent that a metal tie is requiredacross the opening, the tie shall be fastened to the plate at each side of the openingwith a minimum of _______________10d nails at each side, or equivalent.
Page 222
R602.6.1
59 / 155
59. The certificate of occupancy shall contain all of the following information except:
Page 14
1300.0220 Subp 5
60 / 155
60. The maximum amout paid out by the contractor recovery fund is $___________ per homeowner, $__________ per year and $____________per license.
MN Statute 326B.89
61 / 155
61. Double underlayment is required for an asphalt shingle application where the roof hasa slope of up to _______________ .
Page 478
Table R905.1.1(2)
62 / 155
62. Unless local conditions warrant otherwise, what is the probability for termite infestationfor dwellings constructed in most of Minnesota?
Page 92
Figure R301.2(7)
63 / 155
63. To be considered a valid construction contract in Minnesota each and every contract must include...
MN Statute 326B.809
Page 491 R1001.2
64 / 155
64. The footing for a masonry fireplace and chimney shall be a minimum of...
65 / 155
65. Where supporting only a light-frame exterior bearing wall and roof, what is the maximumcantilever span for 2 by 10 floor joists spaced at 16 inches on center, providedthe roof has a width of 32 feet and the ground snow load is 30 psf?
Page 184
Table R502.3.3(1)
66 / 155
66. What is the wind design speed for Minnesota
Page 76
Table R301.2(1)
67 / 155
67. Where SPF #2 ceiling joists create an uninhabitable attic without storage and arespaced 24 inches on center, what is the maximum allowable span when 2-inch by 6-inch members are used?
Page 447
Table R802.5.1(1)
68 / 155
68. A purpose of the contractor recovery fund is to
MN Statute 326B.89 Subd 4
69 / 155
69. Any contractor disturbing more than 20 sq ft of lead based paint on the exterior of the house must...
Federal title 24 EPA RRP rule
70 / 155
70. For a tiny house what is the minimum loft floor area?
Page 567 AQ104.1.1
71 / 155
71. When marketing your construction business, your license number needs to be displayed on...
MN Statute 326B.87
72 / 155
72. A series of tasks that controls the start and finish dates of a project is called
73 / 155
73. What wind exposure category is appropriate for a dwelling located in a residentialdevelopment in a suburban area?
Page 75
R301.2.1.4
74 / 155
74. Where reinforcement is provided in concrete slab-on-ground floors, the reinforcementshall be supported to remain within what section of the slab during the concreteplacement?Where reinforcement is provided in concrete slab-on-ground floors, the reinforcementshall be supported to remain within what section of the slab during the concreteplacement?
Page 203
R506.2.4
75 / 155
75. A driveway needs 6 cubic yards of concrete and is 40'-3" long and 96" wide. What will the thickness of the driveway be?
(40.25*8*.5)/27=5.96
76 / 155
76. A homeowner discovers a potential warranty issue after the contractor finishes the remodeling project. How many months from discovery does the homeowner have to notify the contractor of the issue?
MN Statute 327A.03 (a)
77 / 155
77. Overflow scuppers utilized for secondary roof drainage shall have a minimumsize_______________ of the roof drain.
Page 476
R903.4.1
78 / 155
78. The minimum thickness of a soil-gas membrane is _____mil polyethylene.
Page 20
1303.2401 Definitions
79 / 155
79. Glazing adjacent to a door to a storage closet is not required to be safety glazing providedthe closet is a maximum of _______________ in depth.
Page 108
R308.4.2 Exception 3
80 / 155
80. What is the minimum insulation requirement for a wood foundation?
Table R402.1.1 footnote i
81 / 155
81. A homeowner signs a contract for a contractor to remodel their kitchen. In order for the contractor to have lien rights the contractor must...
82 / 155
82. Violation of the building code is a...
Page 10
1300.0150
83 / 155
83. What is the amount of concrete needed to install a patio that is 14'-6" wide by 16'-4" long and 4" thick?
The measurement is always in cubic yards and the calculations is always done in feet. There are 27 cubic feet in a cubic yard. (14.5*16.3*.3)/27
84 / 155
84. Within a shower compartment, the walls shall be finished with a nonabsorbent surfaceto a minimum height of _______________.
R307.2
85 / 155
85. If a contractor fails to correct a violation the forgivable portion of a penalty will be due and payable with _______days.
MN Statute 326B.083 Subd 3 #3
86 / 155
86. Horizontal insulation used in a frost protected shallow foundation system shall beprotected against damage if it is located less than _______________ inches below theground surface.
Page 139
R403.3.2
87 / 155
87. Concrete is made from gravel, water, portland cement and...
Concrete is made with portland cement, sand, gravel and water.
88 / 155
88. ACI 318-14 is a reference standard addressing _______________.
Page 623 ACI 318—14: Building Code Requirements for Structural Concrete
89 / 155
89. In the attachment of asphalt shingles, special methods of fastening as established bythe manufacturer are required where the roof slope of _______________ is exceeded.
R905.2.6
90 / 155
90. Permits are not required for...
Page 7
1300.0120 (8)
91 / 155
91. Screws attaching floor sheathing to cold-formed steel joists shall be installed with aminimum edge distance of __________ inch.
Page 189
R505.2.5
92 / 155
92. Where masonry veneer is used, concrete and masonry foundations shall extend aminimum of _______________ above adjacent finished grade.
Page 171
R404.1.6
93 / 155
93. A permit is not required for the construction of a one-story detached accessory structure when it has a maximum floor area of _______________ square feet.
1300.0120 Subp 4 (1)
94 / 155
94. The ends of floor joists shall bear a minimum of _______________ on wood ormetal.
R502.6
95 / 155
95. Where the hearth extension for a masonry fireplace is located at the same level as thebottom of the firebox opening, the minimum required thickness of the hearth extensionis _______________ inches.
Page 494 R1001.9.2
96 / 155
96. For new construction what is the minimum warranty requirement for a structural issue?
MN Statute 327A.02 Subd 1 (c)
MN Statute 326B.802 Subd 11
97 / 155
97. A residentail building contractor license allows all of the following except.
98 / 155
98. Screws for attaching gypsum board to wood framing shall penetrate the wood aminimum of _______________.
Page 406
R702.3.5.1
99 / 155
99. Wood structural panels 15/32-inch thick are to be used as subfloor sheathing and are tobe covered with 3/4-inch wood finish flooring installed at right angles to the joists.What is the maximum allowable span of the wood structural panels if the span ratingof the panels is 32/16?
Page 187
Table R503.2.1.1(1), Note h
100 / 155
100. It is the duty of the _______________ to notify the building official that work is ready for inspection.
Page 12
1300.0210 Subp 4
101 / 155
101. A residential licensed contractor is required to have ____hours of continuing education every 2 years
MN Statute 326B.821 Subd 2
102 / 155
102. The continuous vapor barrier required in an unvented crawl space shall extend a minimumof _______________ inches up the stem wall.
R408.3 #1
103 / 155
103. Where a steel fireplace unit incorporating a steel firebox lining is installed with solidmasonry to form a masonry fireplace, it shall be constructed with minimum_______________-inch steel.
Page 491 R1001.5.1
104 / 155
104. If a contractor fails to make payment for labor, skill, materials or machinery for which a client has provided money for. The contractor is guilty of...
MN Statute 514.02 Subd 1
105 / 155
105. Construction documents are required to include all of the following except.
Page 24
1322.0103
106 / 155
106. Mortar is made with all of the following except.
Mortar is made from portland cement, sand, lime and water
107 / 155
107. Emergency escape and rescue openings, when considered as grade floor openings,shall have a minimum net clear opening of _______________.
Page 111
R310.2.1 Exception
108 / 155
108. HVAC ductwork installed in a garage must have a minimum insulation value of?
Page 50
Table R403.2.1
109 / 155
109. When 1/2-inch gypsum board is used as an interior wall covering and installed perpendicularto framing members at 16 inches on center, the maximum spacing ofnails is _______________ on center where adhesive is used.
Page 405
Table R702.3.5
Page 5
1300.0110
110 / 155
110. The building official has the authority to _______________ the provisions of the code.
111 / 155
111. The ______________ is authorized and directed to enforce the provisions of this code.
112 / 155
112. Grounds for sanctions include all of the following except
MN Statute 326B.84
113 / 155
113. In all cases, a masonry chimney shall extend a minimum of _______________ abovethe highest point where the chimney passes through the roof.
Page 496 R1003.9
114 / 155
114. An individual is exempt from Workers Compensation if they are a spouse, parent or _____of an excutive officer of a closely held corporation
Statute 176.041 Subd 1 #10
115 / 155
115. A roof projection on a dwelling shall be located a minimum of _______________from an interior lot line.
Page 100
Table R302.1(1)
116 / 155
116. When two or more flues are located in the same masonry chimney, they shall be separatedby masonry wythes having a minimum thickness of _______________.
Page 497 R1003.13
117 / 155
117. The minimum footing depth for Olmstead county is...
Page 18
1303.1600 Subp 1
118 / 155
118. When paying wages to an employee an employer is commiting fraud if the following are done except
MN Statute 181.03 Subd 1
119 / 155
119. Wood studs shall have a minimum clearance of _______________ from the backface of a masonry fireplace.
Page 494
R1001.11
120 / 155
120. Where required on an asphalt-shingled roof of 5:12 slope, an ice barrier shallextend from the lowest edges of the roof surfaces to a minimum of_______________ inches inside the exterior wall line of the building.
Page 480 or 481
R905.1.2 or R905.2.7
121 / 155
121. When waterproofing a foundation wall. The waterproofing material must extend from the top interior wall edge,
R402.1.1 #1
122 / 155
122. The elements of a drawing are lines, dimensions, views and...
The elements of a drawing are: lines, dimensions, symbols, views and notes.
123 / 155
123. What is the minimum required size of a hearth extension for a masonry fireplace havinga 30-inch-high by 42-inch-wide fireplace opening?
R1001.10
124 / 155
124. What is the minimum required size of a steel angle spanning 8 feet used as a lintelsupporting one story of masonry veneer above?
Page 420
Table R703.8.3.1
125 / 155
125. Access to an under-floor space through a perimeter wall shall be provided by a minimum_______________ access opening.
Page 175
R408.4
126 / 155
126. Concrete used in a basement slab shall have a minimum compressive strength of_______________ where a severe weathering potential exists.
Page 128
Table R402.2
127 / 155
127. An exterior wood deck may be constructed of all of the following except...
1303.2000
128 / 155
128. For rooms other than sleeping rooms, what is the minimum uniformly distributed liveload that is to be used for the design of the floor system?
Page 98
Table R301.5
129 / 155
129. An individual must pay the commission a license re-instatment fee of _____after revocation, suspension or voluntary termination of their contractors license.
MN Statute 326B.096
130 / 155
130. What is the maximum oversizing of heating and A/C equipment?
Page 53
R403.5.17
131 / 155
131. Water-resistant gypsum board shall not be installed over which of the followingclassifications of vapor retarders when located in a tub or shower compartment?
R702.3.7
132 / 155
132. The commissioner may issue a notice of violation to__________in regards to violation of an applicable law.
MN Statute 326B.082 Subd 6
133 / 155
133. A contractor has ____days after the completion of the project to file a lien notice.
MN Statute 514.08 Subd 1
134 / 155
134. A radon control system is required to be install when...
1303.2400 Subp 1
135 / 155
135. Where located less than 5 feet above the walking surface, glazing in a wall enclosingan outdoor hot tub shall be considered to be installed in a hazardous location unlessthe glazing is a minimum of _______________ horizontally from the water’s edge.
Page 109
R308.4.5
136 / 155
136. Where 15/32-inch wood structural panels having a span rating of 32/16 are used as roofsheathing, what is the maximum span without edge support?
Page 456 then page 187
R803.2.2 then table R503.2.1.1(1)
137 / 155
137. In a situation where a residential contractor losses its qualifing person, how many days does it have to replace the qualifing person before termination of the license?
MN Statute 326B.825
138 / 155
138. Lein rights with respect to real esate only applies to...
MN Statute 514.01
139 / 155
139. On a site having expansive soil, roof drainage water shall discharge a minimum of_______________ feet from the foundation walls or to an approved drainage system.
R801.3
140 / 155
140. 1/4 scale is defined as.
1/4 scale is one fourth of a foot or 3". 1/48 scale = 1/4"
141 / 155
141. The ground snow load for Goodhue county is...
1303.1700
142 / 155
142. Where the cantilevered portion of a rafter is notched, a minimum of_______________ inches of the member depth must remain.
Page 451
R802.7.1.1
143 / 155
143. Except for Rumford fireplaces, the firebox of a masonry fireplace shall have a minimumdepth of _______________ inches.
Page 492 R1001.6
144 / 155
144. Nails used to attach concrete roof tiles to the roof deck shall penetrate the deck aminimum of _______________ or through the thickness of the deck, whichever isless.
Page 482
R905.3.6
145 / 155
145. In a 24" O.C. steel framed wall with an insulation value of R19+10.1. What is the wood framed wall equivilant?
Page 47
Table R402.2.6
146 / 155
146. Where 3/8-inch particleboard is used as an exterior wall covering, what type of fastenersare required if the particleboard is attached directly to the studs?
Table R703.3(1)
147 / 155
147. A curtain wall is defined as...
Page 26
R202 definitions
148 / 155
148. Unless specifically approved, what is the maximum slump permitted for concreteplaced in removable foundation wall forms?
Page 167
R404.1.3.3.4
149 / 155
149. A roof system is subjected to a 50 psf ground snow load and creates a dead load of 20psf. The ceiling is not attached to the rafters. Assuming that rafter ties are provided atthe top plate line, what is the maximum span of 2-inch by 8-inch Hem-Fir #1 raftersspaced at 24 inches on center?
Page 438
Table R802.4.1(5)
150 / 155
150. What wind exposure category is appropriate for a dwelling located in a residentialdevelopment in a suburban area?
Page 75 R301.2.1.4
151 / 155
151. The maximum pay period for salaries earned is...
MN Statute 181.101
152 / 155
152. Openings provided for roof ventilation, where covered with corrosion-resistant wirecloth screening, shall have openings a minimum of _______________ and a maximumof _______________.
Page 471
R806.1
153 / 155
153. A minimum design live load of _______________ shall be used for the determinationof the maximum allowable floor joist spans in attics that are accessed by a fixed stairway.
Page 177
R502.3.1
154 / 155
154. In a nonbearing partition, a wood stud may be notched a maximum of_______________.
R602.6 #1
155 / 155
155. The illumination source for interior stairs shall be capable of illuminating the treadsand landings to a minimum level of _______________ foot-candle(s).
Page 106
R303.7
Your score is